Set up XBee Industrial Gateway summary

These instructions give an overview of how to set up XBee Industrial Gateway.

  1. Configure the network settings. These settings include IP networking parameters and Remote Manager connectivity. For more information, see:
  2. Connect the XBee nodes to XBee Industrial Gateway. This step involves configuring the parameters for forming XBee networks on both XBee Industrial Gateway and XBee nodes. There are three substeps:

    1. Configure XBee Industrial Gateway as a coordinator.
    2. Join XBee nodes to the coordinator.
    3. Verify that the XBee nodes are joined to the coordinator.

    See Connect the XBee nodes to XBee Industrial Gateway for more information.

  3. Configure XBee ZigBee network addressing settings. See Configure the ZigBee network addressing parameters for XBee nodes for more information.
  4. Explore configuring XBee nodes for input/output.
    1. If using serial I/O, configure XBee nodes for serial I/O. See Explore serial I/O for more information.
    2. If using digital or analog I/O, configure the XBee nodes for digital or analog I/O. See Explore digital and analog I/O for more information.
  5. Look at your device data on Remote Manager. See View your device data for more information.

The following image shows the layout of a fully set up XBee Industrial Gateway.